Heaton House, Birmingham: Case Study Summary
Client | Location | Sector | Main Contractor |
---|---|---|---|
Kavannagh Construction | Birmingham | Residential | Elevate |
Working with Kavannagh Construction & Elevate Property Group in their prestigious restoration of the historic 19th century Georgian villa ‘Heaton House’ - a landmark site that dates back to the beginning of the Jewellery Quarter (circa 1795).
The scheme consists of 14 townhouses having terraced gardens, on-site gated car parking and 42 apartments including 6 Lofts.
The logistically challenging project, developed around a Grade 2 listed building, was completed by the Sigmat team in 23 weeks.
This was our first project working with Sigmat, and we've been delighted with the results. The MMC advantage of programme surety and speed of installation on site has encouraged us to select the Sigmat LGSF system for our next project. We look forward to working with the team again.